Asset 2Asset 2Asset 2Asset 2
  • HOME
  • ABOUT US
  • SERVICES
  • PORTFOLIO
  • SUPPLIERS
  • BLOG
  • CONTACT US
✕

ROOFDECK Platinum

  • Home
  • Featured
  • ROOFDECK Platinum
August 24, 2021
Categories
  • Featured
  • SYNLawn
Tags
RD1
SYNLawn-DC
Roofdeck Platinum

The ultimate artificial roof, deck, and patio grass for performance and safety. Nylon fibers provide a high melt, resistance against window reflectivity, and the highest-rated safety rating in the industry.

The clear choice for aesthetics and safety amongst architects, specifiers, and homeowners, SYNLawn Roofdeck Platinum, is the ultimate in beauty and safety. The first Class A Fire-Rated artificial grass not requiring infill by combining nylon fibers with our exclusive EnviroLoc™ backing and HeatBlock™ technologies for incredible durability and low surface temperatures. SYNLawn Roof Platinum is used by architects and specifiers where weight and safety are concerns, including urban rooftops, decks, patios, and high foot traffic areas

Share

Related posts

August 24, 2021

PET Premium


Read more
August 24, 2021

TrackTurf


Read more
September 18, 2019

urbanCONCRETE


Read more

Comments are closed.

ROOFDECK Platinum

66 Third Avenue, Barataria
Trinidad & Tobago

ROOFDECK Platinum

1-868-674-1661
info@internationalinteriorstt.com

© International Interiors. All Rights Reserved. Powered by C7 Caribbean

      Guardian Life – One Woodbrook Place

      International Interiors Ltd. was responsible for installation of Carpet Tile and LVT. We had to install both types of products in over 20 different patterns and colours, both LVT and Carpet tiles, in a complex interconnected layout‍ that created a fascinating visual effect.



      Client

      Guardian Life



      Architect

      Rejane Limited



      Project Duration

      1 Week



      Location

      Port of Spain,
      Trinidad & Tobago



      Services & Products

      – Project Management
      – Interior Finishes

      RBC Independence Square

      International Interiors Ltd. was the main contractor for this project and provided complete project management services. The project was completed in 2 phases: Phase 1 consisted of a complete rebuild of 4 floors of the bank. We installed a custom RBC branded Interface carpet tile; Phase 2 consisted of total buildout of the entire mezzanine from the ground up and completion of an additional floor.



      Client

      RBC Royal Bank



      Architect

      Gillespie and Partners



      Project Duration

      5 Months



      Location

      Independence Square,
      Trinidad & Tobago



      Services & Products

      – Project Management
      – Floor Finishes
      – Escalator Removal
      – Interface

      RBC – Maraval

      International Interiors Ltd. was the main contractor for this project and provided complete project management, including a full scope of interior finishes, furnishings and services. The project also involved a unique element of suspended acoustic tile ceiling, which provided effective noise control. IIL completed the project ahead of schedule while accommodating for the complex installation.



      Client

      RBC Royal Bank



      Architect

      Gillespie and Partner



      Project Duration

      3 Months



      Location

      Maraval,
      Trinidad & Tobago



      Services & Products

      – Project Management
      – Floor Finishes

      Hilton Finance Offices

      International Interiors Ltd. was the main contractor for this project and provided complete project management services. The project involved gutting of the existing executive lounge and conference spaces at Hilton and a complete interior rebuild including cubicles and ceiling works as well. The works extended to the Hilton lobby as well. A Ply-Boo wall panel was installed in the lobby which gave the interior a fascinating tropical feel.



      Client

      Hilton International



      Architect

      IIL Design Build



      Project Duration

      2 Months



      Location

      Port of Spain,
      Trinidad & Tobago



      Services & Products

      – Commercial Interior Build-Out
      – Painting
      – Flooring
      – MEP
      – Interface

      ScotiaBank Bistro

      International Interiors Ltd. was the main contractor for this project and provided complete project management services. The project involved a porcelain tile installation, buildout of interior walls to create a brand new kitchenette, installation and rewiring of electrical and HVAC components. Additionally, oak wood and marble finishes were incorporated to give the bistro a contemporary and welcoming appearance.



      Client

      ScotiaBank



      Architect

      ArchID



      Project Duration

      1 Months



      Location

      Port of Spain,
      Trinidad & Tobago



      Services & Products

      – Project Management
      – Interior Finishes

      ScotiaBank Hub Refresh

      International Interiors Ltd. was the main contractor for this project and provided complete project management services. The project involved several elements such as gypsum wall buildout, installation of carpet tiles and vinyl flooring, back-painted glass and graphics features on several walls. A Di-Noc Wall Covering, in a fine wood finish, was specially sourced from Canada for installation as well.



      Client

      ScotiaBank



      Architect

      ArchID



      Project Duration

      1 Week



      Location

      Chaguanas,
      Trinidad & Tobago



      Services & Products

      – Project Management
      –  Interior Finishes
      – Shaw Contract

      Republic Bank West Mall

      International Interiors Ltd. was responsible for installation of Carpet Tile. We installed a custom Republic Bank branded Interface carpet tile as well as Interface carpet planks. Additional we created a transitions between different sections using metallic LVT as transitional pieces.



      Client

      Republic Bank



      Architect

      RBL Premises Division



      Project Duration

      2 Weeks



      Location

      Westmoorings,
      Trinidad & Tobago



      Services & Products

      – Carpet Finishes
      – Interface

      Repsol Trinidad Cafe

      International Interiors Ltd. was responsible for installation of LVT. The cafe was completed as part of 4 floor flooring installation at Repsol. We incorporated Burke Endura Rubber Flooring as well as seven colors of LVT interlayed in a pattern that livened up the area to create an inviting, communal space for Repsol employees.



      Client

      Repsol



      Architect

      Chatho Designs



      Project Duration

      1 Week



      Location

      Port of Spain,
      Trinidad & Tobago



      Services & Products

      – Floor Finishes
      –  Shaw Contract
      – Burke

      SuperPharm Headquarters

      International Interiors Ltd. was responsible for installation of LVT at the SuperPharm HQ. The project was one of the largest LVT installations carried out by the company, with over 13000 sq ft of resilient LVT being put in. Multiple colours of LVT were installed in a custom patterns designed to compliment each individual space within the HQ.



      Client

      Agostini Interiors



      Architect

      IIL Design Build



      Project Duration

      2 Months



      Location

      El Socorro,
      Trinidad & Tobago



      Services & Products

      – Flooring Finishes
      – Shaw Contract

      MovieTowne Trinidad & Tobago

      International Interiors Ltd. was responsible for the floor and wall finishes. Works were carried out at three MovieTowne locations simultaneously. At the Port of Spain location, floor carpet and wall carpet installations were carried out at all the cinemas along with resIlient LVT flooring. At the San Fernando, location, carpet installation was carried out throughout the cinemas and Interface hospitality carpet tile was installed in the arcade. At the Chaguanas location, Burke rubber tile flooring was installed.



      Client

      MovieTowne Trinidad & Tobago



      Architect

      IIL Design Build



      Project Duration

      3 Months



      Location

      Port of Spain, Chaguanas, San Fernando,
      Trinidad & Tobago



      Services & Products

      – Floor Coverings
      –  Interior Finishes
      – Shaw Contract
      – Interface
      – Burke